Central Queensland Region

30 Projects in Central Queensland Region showing 1-20

Filter projects

Filters

Status
Status
Programs
Programs
Type
Type
Reset
  1. Access to Gladstone Port project

    The project will provide an alternate route for heavy vehicles accessing the Port of Gladstone to increase freight efficiency and improve safety for motorists by easing the impact of trucks travelling...

    No image supplied
  2. Barcaldine-Aramac Road, rehabilitate and widen pavement

    About 20km of the Barcaldine-Aramac Road has been gradually widened to improve travelling conditions...

    No image supplied
  3. Bruce Highway (Bowen – Ayr), Bowen Connection Road to Champion Street intersection, widen pavement

    The project will deliver safety upgrades to almost 6 kilometres of the Bruce Highway between the Bowen Connection Road and Champion Street intersections. Additionally, the Bruce Highway and Don Street...

    No image supplied
  4. Bruce Highway (Bowen – Ayr), construct overtaking lanes

    The Bruce Highway (Bowen – Ayr) overtaking lanes are being delivered as part of the Bruce Highway Upgrade Program, a $13 billion, 15-year program of works aimed at improving safety, flood resilience...

    No image supplied
  5. Bruce Highway (Mackay - Proserpine), Jumper Creek, upgrade flood immunity

    Flood immunity on the Bruce Highway at Jumper Creek, north of Mackay is being upgraded to improve the safety and reliability of this section of the highway and minimise disruption through flood...

    No image supplied
  6. Bruce Highway (Mackay – Proserpine), Goorganga Plains, plan and preserve

    This project involves preparing a business case to upgrade the immunity of the Bruce Highway at the Goorganga and Myrtle Creek floodplains, located 4kms south and 6kms north of Proserpine...

    No image supplied
  7. Bruce Highway (Mackay – Proserpine), Knobels Road, upgrade intersection and approaches

    Safety upgrade on the Bruce Highway at the intersection of Knobels Road and Nebia Coningsby Road, north of Mackay is being delivered to improve the safety and visibility of this section of the highway...

    No image supplied
  8. Bruce Highway (Proserpine - Bowen), Emu Creek to Drays Road, various locations, widen formation

    The Bruce Highway Safety Package – Emu Creek to Drays Road is being delivered as part of the Bruce Highway Upgrade Program, a 15-year, $12.6 billion program of works aimed at improving safety, flood...

    No image supplied
  9. Bruce Highway (Proserpine – Bowen), Bowen Connection Road, improve intersection

    The project will deliver safety upgrades to almost 6 kilometres of the Bruce Highway between the Bowen Connection Road and Champion Street intersections. Additionally, the Bruce Highway and Don Street...

    No image supplied
  10. Capricorn Highway (Emerald - Alpha), widen pavement

    Works are underway to widen 3 high priority sections of the Capricorn Highway between Emerald and Alpha...

    Capricorn Highway (Emerald - Alpha), widen pavement project map
  11. Cramsie-Muttaburra Road, rehabilitate and widen pavement

    This project will widen and rehabilitate a 3km section of aged, narrow pavement on the Cramsie-Muttaburra Road to a width of 8m, improving safety, overtaking opportunities and travel times...

    The map shows the location of rehabilitation and widening works underway on a three kilometre section of the Cramsie-Muttaburra Road. The road is situated between Longreach and Muttaburra in Central West Queensland. The map shows the proximity of the works to the Longreach township and includes the surrounding road network, such as the Landsborough Highway and local government-owned Longreach-Muttaburra Road.
  12. Eton Range Realignment Project

    Eton Range fully opened to traffic on 1 October 2020. The existing range has been upgraded to 4 lanes, added a split carriageway for part of the range and reduced the grade to improve safety and...

    Eton Range
  13. Eyre Developmental Road (Bedourie - Birdsville), pave and seal

    Around 35km of the 185km road is being sealed to improve safety, connectivity and wet weather access...

    No image supplied
  14. Isisford-Blackall Road, pavement rehabilitation

    Works are underway to progressively rehabilitate about 26km of high priority sections of the Isisford - Blackall Road with completion expected in mid-2022...

    No image supplied
  15. Long-distance passenger rail business case

    We are preparing a business case to replace the rollingstock on the long distance passenger rail fleet that services western regional Queensland...

    No image supplied
  16. Mackay Northern Access Upgrade, construct additional lanes

    We are upgrading the highway, and major intersection upgrades, north of Mackay to reduce congestion and improve traffic flow in critical areas...

    Mackay Northern Access
  17. Mackay Port Access, Bruce Highway to Mackay - Slade Point Road, construct new two-lane road

    The Mackay Port Access will join the Mackay Ring Road project, Mackay Northern Access Upgrade project, the Mackay Ring Road to Bald Hill Connection project for connection from the Bruce Highway at...

    No image supplied
  18. Mackay Ring Road

    The need for the Ring Road was identified to keep pace with the rate of growth of the Mackay area and to better prepare the region for future growth...

    Pioneer River construction Mackay Ring Road
  19. Mackay – Bucasia Road, capacity upgrades and duplication planning

    Planning is underway to identify potential future upgrades to Mackay – Bucasia Road to improve congestion, safety, and flooding impacts on this vital link to the Northern Beaches...

    No image supplied
  20. May Downs Road, pave and seal

    The May Downs Road, pave and seal project is delivering $8 million in road improvements to boost connectivity between the western and eastern parts of the Isaac Regional Council area...

    Map showing the location of work to be completed on the May Downs Road.
Previous Page (disabled)
  1. Page 1
  2. Page 2